AseanPrimer • Pre-Binding Underwriting Dossier (Indonesia Hub)
PT Nusantara Healthcare Solutions
Location / AssetJababeka Industrial Estate, Cikarang, West Java
Screening MandatePre-Binding Regulatory Exposure & OSS-RBA
Underwriting ProtocolP4-A Schema (v1.2.0 Frozen)
Underwriting Doctrine & Limits

1. Transaction Perimeter & Healthcare Facilities

2. Data Room Physical & Regulatory Inventory

A. Corporate Registry & Foreign Investment

B. Sectoral Licensing & Healthcare Operations

C. Land, Environmental Approvals & Compliance Reporting

AseanPrimer • Evidence Matrix & Inquiries
Underwriting Matrix & Priority RFIs
Target AssetPT Nusantara Healthcare Solutions
Financial BaselineUSD 5.00M Reported LTM EBITDA
Primary FocusFacility B Interim Operations & Authorisation Gap

1. Evidentiary Determination Matrix

Area Evidentiary Fact Identified Uncertainty P4-A Status
Facility A
(Core Operations)
Clean HGB title (DOC-05), PBG/SLF building permits, and valid healthcare authorisation (DOC-07). NIB records reflect KBLI 2020 codes; administrative transition to KBLI 2025 (Peraturan BPS 7/2025) pending transition schedule. Core operational documentation verified on tested perimeter. DOCUMENTS VERIFIED*
USD 3.50M (Reported)
Facility B
(Expansion Wing)
Building construction physically complete with active operations reported under interim expansion protocols since Q1 2026. Final licence or verified standard certificate (DOC-12) is unprovided. The available record does not evidence the statutory basis of the interim protocols, nor does it establish whether substantive operational authorisation was granted under PP 28/2025 and Permenkes 11/2025. Whether commercial activities are lawfully authorized under the current operating configuration remains an unverified underwriting assumption. This gap does not by itself establish unlawful operation. MISSING EVIDENCE
CONDITIONAL
KBLI Classification
(2020 vs 2025)
NIB registration (DOC-03) reflects KBLI 2020 codes vs newly effective KBLI 2025 5-digit classifications (Peraturan BPS No. 7/2025). Administrative divergence during national transition period. Actual revenue streams across clinical services and medical equipment assembly require mapping against KBLI 2025 schedules to verify whether corporate purpose or licensing adjustments are legally required based on current operations. ALIGNMENT
RECONCILIATION
Regularisation Cost
(Licensing Retainer)
Third-party specialized regulatory consultancy quote of USD 85,000 (DOC-18). Scope is limited to administrative regularisation and standard certification filings. Structural modifications, operational disruption, or remedial capital expenditure remain unquantified. INDICATIVE
USD 85,000

*Documentary inventory examination status only; reflects internal consistency of listed records against defined schema criteria and does not constitute an independent legal validation of clinical/manufacturing activities or reported EBITDA.

2. Four Priority Pre-Binding Requests for Information (RFI)

AseanPrimer • Negotiation Protocols
Contractual Mitigants & Reservations
Target AssetPT Nusantara Healthcare Solutions
Proposed PostureSubject to Evidence Review
Regularisation ReferenceUSD 85k Preliminary Quote (Unquantified Total)

1. Transaction Structural Options for Deal Team

Structuring Option Underwriting Mechanics & Risk Allocation
1. Condition Precedent
(CP to Closing)
Require Seller to obtain and deliver verified operational authorisation documentation (or evidenced statutory clearance of interim operating protocols) for Facility B (DOC-12) prior to Closing, subject to local counsel confirmation of procedural feasibility and realistic administrative timelines under OSS-RBA.
2. Specific Indemnity & Escrow Holdback A dedicated indemnity and escrow holdback may be considered after technical and legal scoping. DOC-18 provides an indicative benchmark of USD 85,000 for administrative advisory fees only; facility modifications, compliance costs, and potential operational disruption remain unquantified.
3. Valuation Adjustment
(Conditional Earn-Out)
Retain reported consolidated LTM EBITDA of USD 5.00M as the financial baseline, subject to financial diligence. Assess any adjustment to the Facility B contribution (reported USD 1.50M) only after reviewing clinical throughput, revenue attribution, and the operational validity of the interim protocols. A deferred earn-out or contingent consideration may be structured if material, evidenced operational exposure remains.

2. Explicit Engine Scope & Indonesian Legal Counsel Remit

A. Schema Boundary (P4-A Engine)

B. Indonesian Legal Counsel Exclusive Remit